Hello Caetano,
I went through CO09 results, could identify that the order reservations weren't confirmed. I could find that for checking rule '02' check with RLT has been checked and whereas for 'PP' check with RLT hasn't been checked.
Checking Rule @ Creation:
Checking Rule @ Release:
As here Order Res marked in checking rule @creation screen is later/outside to Replenishment lead time. Outside the replenishment lead time the system would assume the stock to be available right ? This is my assumption to RLT . Is this the reason behind difference of ATP results ?
What does confirmed and cummulative ATP quantity mean btw?
Regards,
Rahul