yes... I didnt enter any date in the material master.... we are supposed to enter SLED directly in the batch during the GR (from MIGO screen,, batch tab)
the 00.00.0000 is the date when we leave it empty, during the GR (error happens also when we specify SLED)...
it used to work before... but now am not sure what could have happened